logoBC
Yaoundé - 25 April 2024 -
Transport

Cameroon: Construction of Edéa-Kribi highway in 2018 to cost about CFA500 billion, according to government

Cameroon: Construction of Edéa-Kribi highway in 2018 to cost about CFA500 billion, according to government
  • Comments   -   Sunday, 31 December 2017 02:54

(Business in Cameroon) - Cameroon’s ministry of public works (MINTP) informs that feasibility studies for the construction of the Edéa-Kribi expressway are available. According to these studies, the construction of the infrastructure which will span over about 100 km will cost about CFA500 billion.  

The MINTP thus indicated that in 2018, an expressway connecting Edéa and Kribi will be built. The focal points of this project are the crossing of Mangombé reserve on about 20 km, the construction of four upper or lower structures and nine crossings structures such as Nyong and Lokoundjé bridges. An interchange will also be built in Edéa, and, another one in Fifinda, in order to link with the nationale n°7.

The Edéa-Kribi highway is a segment of Edéa-Kribi-Lolabé (138 Km) motorway which will serve the southern resort town’s deepwater port.

Kribi-Lolabé (38 Km), the first segment which is being built by Harbour Engineering Company, a Chinese firm, for CFA250 billion, is nearly completed.

The new infrastructure, to be constructed in 2018, is a 2x3 lane commissioned directly, large of 33.5 meters, with 3-meter emergency lanes and a 3-meter median.

S.A

cameroon-s-red-cocoa-nears-labeling-as-oapi-awaits-coloration-analysis
The Cameroon red cocoa, listed in 2019 as a product eligible for geographical indication (GI), has progressed towards labeling by the African Intellectual...
cameroon-poultry-expo-revives-focus-on-industry-transformation
The 2024 edition of the Yaoundé International Poultry Exhibition (Savi) kicked off on April 23 at the Congress Palace. The event organized by the Cameroon...
beac-s-bond-auction-meets-success-in-inflation-combat-efforts
On April 22, the Central African Central Bank (Beac) concluded a successful 14-week bond issuance worth CFA50 billion. This move, offering a 2.5% interest...
cameroun-delays-bond-sale-amid-regional-market-strain
The Cameroon government has postponed its planned 2024 bond sale, originally slated for April, due to market saturation caused by Gabon and the Central...

Mags frontpage


Business in Cameroon n110: April 2022

Covid-19, war in Europe: Some Cameroonian firms will suffer


Albert Zeufack: “Today, the most important market is in Asia”


Investir au Cameroun n120: Avril 2022

Covid-19, guerre en Europe : des entreprises camerounaises vont souffrir


Albert Zeufack: « Le marché le plus important aujourd’hui, c’est l’Asie »